An ecoPlanet Internet Store

                    Beautiful, natural, earth-friendly decorating materials!

Home ] Up ] 

Search

Flooring

Bamboo Flooring

Natural Wool Carpet

Natural Wool Rugs

Organic Cotton Rugs

Cork Flooring

Cork Underlayment

Decor

Holiday Ornaments NEW

Handmade Copper Bowls & Boxes

Handmade Copper Trays & Plates

Hand Hammered Copper Vases

Brass Luggage Rack NEW

River Stone Vases

Sustainable Clocks

Metal & Glass Vases NEW

Signs: Words To Live By NEW

Furniture

Handcrafted Stone Tables

Lighting

Leaf Nightlights

Natural Twig & Stone Lamps

Miscellaneous

Sustainable Trash Cans

Wall Treatments

Cork Wall Tiles

Textured Wall Treatments

 

Gift Certificates

 

 View Shopping Cart By Clicking On This Button

(Use the Cart to order securely online or the Mail/Fax form to mail or fax us your order.)


FAQ
 

EcoLiving Center
 

Gift Registry

Click to Create MyGiftList!

  

 

Installation Bamboo Strip Flooring Instructions

 

Bamboo - Installation Recommendations

You must read and understand these instructions completely before installing the Bamboo flooring. Responsibility for the suitability of cork Bamboo for each individual installation cannot EcoPlanet, EcoChoices, or the manufacture, since Natural Cork Inc., has no influence on the installer's proper application. Should an individual plank be doubtful as to appearance or dimension the installer should not use this piece. Any defect must be reported directly to EcoChoices or the manufacture. The manufacture will send a replacement in a timely manner.

NOTE: We makes no warranty or guarantee of the quality of work performed by a selected installer. We disclaims all liability for imperfect installation of its product. Bamboo pre-finished flooring is best installed over a wood subfloor using staples/brads or glue. Gluing pre-finished Bamboo directly to a concrete subfloor may be done on or above grade. Do not install Bamboo below grade. Bamboo may be applied over in-floor radiant heating systems. Recommended equipment is the Stanley Bostitch Flooring Nailer. Proper use of this equipment will render good results.

ACCLIMATION: Bamboo flooring must be allowed to acclimate on-site a minimum of 72 hours in advance of installation. Open each box and remove shrink-wrap completely. During the acclimation period it is important that temperature and humidity levels be maintained in accordance with those expected to exist after installation. Optimum installation conditions are 70 degrees Fahrenheit at 30 - 50% humidity.

SUBSTRATE PREPARATION: Underlayment-grade plywood and man-made board substrates must be clean, level, dry, and free of contaminants. Optimum results will be achieved through use of 3/4” CDX plywood substrate. Fill any low spots with appropriate filler and sand any high spots. For buildings with a raised foundation, install ground cover of 6 mil polyethylene sheets over the earth in crawl space.

Concrete Substrate must be on or above grade. Concrete is required to be sound, smooth, level and flat with a maximum variation of 1/8” in 10’. Fill any low spots with appropriate filler and scrape any high spots. Subfloor must be properly cured and tested for moisture content. Slab must be properly cured. Flooring must not be installed if vapor pressure exceeds 3 lbs. per 1000 square feet in 24 hours using calcium chloride test method.

INSTALLATION: Flooring should be square with the space, running parallel to longest room dimension. A 1/2” expansion space must be left around entire perimeter. It is important that the tongue & groove of each plank fit together tightly at all seems and butt joints. Starter row must be held firmly in place using either nails or wedging. Use of proper equipment will improve overall quality of installation.

Nail Down Method: Once starter rows are secure, additional rows should be blind nailed using a professional quality flooring nail gun. Excessive splitting or cracking of plank tongue can result from use of improper equipment or incorrect equipment settings. Holding nail gun at a 45-50 degree angle to face of plank, insert nails directly above tongue. Beginning a minimum of 2 inch from end of first plank, space nails at 8 inch intervals. To prevent splitting, nails should not be placed closer than 2 inch from either end of plank. Two inch long flooring nails (cleats), or 2-inch, 15 gauge flooring staples with a 1/2 inch crown are recommended.

Glue Down Method: Room, flooring material and containers of adhesive should be conditioned at normal room temperature for 72 hours before beginning installation. Use only manufacturer’s recommended adhesive. Apply adhesive to substrate with a 1/4" x 3/16" x 5/16" V notch trowel. Immediately and firmly place flooring onto “wet”
adhesive.

NOTE: It is important not to allow glue onto plank surface. If glue does spill or leak onto surface of flooring, please consult adhesive manufacturer for appropriate corrective action.

In-floor Radiant Heat: Regardless of season, radiant heat system should be turned on and remain on for five days in advance of installation. A radiant floor should not produce surface temperatures over 85 degrees Fahrenheit. Continue to operate radiant heat system after installation. When choosing an installer for application over radiant heat, look for members of the Radiant Panel Association.

NOTE: Any wood flooring, to include bamboo, will expand and contract in response to changes
in temperature and humidity. There should be no more than a 2% maximum difference in moisture content between the subfloor and surface flooring material. The amount of movement varies dependant upon temperature, dimensional stability of the materials involved, and moisture content of both the surface flooring and subfloor. Visible gaps at seems and joints will vary seasonally.
 

|Please Email Your Questions To Us: Questions |

Cart  | Mail/Fax form | Gift Certificates |
| FAQ: ordering information |

Phone: MON-THUR 9am-3pm PST, 626-969-3707. Fax: 626-969-3717

 
 

We gladly accept

RemodelNet.com - the Contractor Referral Site


EcoPlanet - EcoChoices Green Store © copyright 1997-2007. All rights reserved. | Feel free to link to any pages. | Press Control+D to Bookmark | Privacy Policy |